latent demand - out there, not aware of it

Product Orientated Layout
Advantages- Efficient production of standardized goods and services
-High processing speed
-Low cost per unit

Disadvantage - Lack of flexibility or customization
-Employee boredom/ dissatisfaction
-Quality problems

Process-Oriented Layout
-Organization by function
-Processing steps can be completed in my sequence
-Products or customers can take my "route" necessary
ADV
-Flexibility
-Customization
DISADV
-Higher cost per unit
-Higher skilled, high cost employees
-Transport/wait time between departments
-Less consistency

Chopshop is the cost highest way to produce thing> depend

CELLUAR LAYOUTS
-A compromise of product and process layout
-Create "families" of products with similar process requirements
-A "cell" contains all resources needed for family

ADV
-Flexibility greater than a product-oriented layout
-Less costly than a process-oriented layout
-Less material transport/wait
-Fewer changeovers
DISADV
-Duplication of resources

Chopshop- within my charter
Cellular- divide up

The Product/Process Matrix
Process Types
Project - unique, one-of-a-kind, products or customers. Generally large in size (building a bridge, installing software system, implementing a major improvement effort)
Job Shop - Predominantly manufacturing, high customization and flexibility, but higher volume than project.
Batch Production- Group of identical products or customers processed together through one step and then move together to the step. More limited product variety, higher production volume.
Assembly Line - Narrowly defined processes, made up of equipment with limited flexibility. Much higher volume. Still the possibility of some flexibility.
Continuous flow (repetitive)- Equipment and stations dedicated to a single thing. Very high volume. Very flow flexibility. Best chance for automation.

Market Orientation: Demand Linkage
*Make-to-stock (MTS)
-Process activated to meet expected or forecast demand
-Customer orders are served from target stocking level
-Shorter lead time for stocked item /Much longer for out of stock item
*Make-to-order (MTO)
-Process activated in response to an actual order
*may be either standing or custom product (AKA ENG-To-Order)
-WIP and finished goods inventory kept to a minimum
-Tend to have longer response time
*Assemble-to-order (ATO)
-Partially manufactured and held in unfinished state
-Customer order dictates final configuration
-Quicker response than MTO; More flexible than MTS

1 comment:

Anonymous said...

When we do not understand things we tend to make assumptions that are not always
correct. Based on that, and what score you decide should represent adequate mastery,
the students are presented with a Banker. For more
information about Lotus Blossom Consulting, LLC, call toll free (877) 881-2685,
email consultant@lotusblossomconsulting.

Feel free to surf to my blog: islamic educational center of san diego